26 thermal power plants were upgraded and built with the replacement of draft equipment on boilers with a total installed capacity of about 30,000 MW
15 units of phosphoric acid, Urea and Nitrogen production were upgraded using corrosion-resistant fans of the BPA series with a total capacity of more than 7 million tons of fertilizers per year
More than 20 gas cleaning systems with energy-efficient smoke exhausters of the KMZ plant were put into operation with a total volume of purified gas of more than 12,000,000 m3 / h
More than 20 forced draft machines from Germany, the USA, Japan, Italy and other countries were replaced